0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1986
Completion: 1991
Status: in use

Project Type

Structure: Immersed tube tunnel
Function / usage: Road tunnel
Construction method: Immersed tube method

Location

Location: , , ,
For:
  • A55 Motorway
Coordinates: 53° 17' 10.84" N    3° 49' 16.17" W
Coordinates: 53° 17' 21.74" N    3° 50' 12.72" W
Show coordinates on a map

Technical Information

Dimensions

tunnel length 710 m

Cost

cost of construction Pound sterling 102 000 000

Materials

tunnel structure precast reinforced concrete

Participants

Structural engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20009179
  • Published on:
    25/04/2003
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine