0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1988
Completion: 1989
Duration of works: 9 months
Status: in use

Project Type

Function / usage: Congress center
Structure: Cable-stayed structure
Truss

Location

Location: , , ,
Part of:
Coordinates: 52° 19' 23.22" N    9° 48' 33.90" E
Show coordinates on a map

Technical Information

Dimensions

building volume ca. 169 000 m²
gross floor area ca. 30 000 m²

Quantities

structural steel 4 500 t
concrete volume 22 500 m³
reinforcing steel 2 200 t
formwork 53 000 m²

Materials

roof truss steel

Participants

Owner
Architecture
Structural engineering
Main contractor
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20016755
  • Published on:
    04/07/2005
  • Last updated on:
    23/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine