0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: March 1961
Completion: November 1963
Status: in use

Project Type

Location

Location: , ,
Location description:

Across Lake Burley Griffin

Coordinates: 35° 17' 34" S    149° 7' 37" E
Show coordinates on a map

Technical Information

Dimensions

main span 73 m
total length 310 m
number of spans 5
number of lanes 2 x 3
abutments number 2 x 2
piers number 2 x 4

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20014698
  • Published on:
    05/12/2004
  • Last updated on:
    07/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine