General Information
Status: | in use |
---|
Project Type
Function / usage: |
Pier |
---|---|
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Esquimalt, British Columbia, Canada |
---|---|
Coordinates: | 48° 26' 28.89" N 123° 26' 56.21" W |
Technical Information
Dimensions
width | 13 m | |
length | 285 m |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Colwood Refuelling Facility Upgrade. Supply of the National Defence on Canada's West ensured. In: DSI Info, n. 13 ( 2005- 2006), pp. 52.
- Erweiterung der Colwood Tankanlage. Versorgung des Verteidigungsministeriums gesichert. In: DSI Info, n. 13 ( 2005- 2006), pp. 52.
- About this
data sheet - Structure-ID
20036228 - Published on:
07/04/2008 - Last updated on:
24/07/2014