General Information

Beginning of works: 2015
Completion: 15 December 2016
Duration of works: 14 months
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Columbia River
Coordinates: 49° 5' 40.20" N    117° 42' 6.94" W
Show coordinates on a map

Technical Information

Dimensions

main span 225 m
total length 280 m

Cost

cost of construction Canadian dollar 15 500 000

Materials

cables steel wire
deck steel
piers reinforced concrete
pylons steel
deck flooring fiber-reinforced polymer (FRP)

Chronology

15 December 2016

Opening of the Columbia River Skywalk.

Participants

Design
Structural engineering
Contractor
FRP manufacturer

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074399
  • Published on:
    17/12/2017
  • Last updated on:
    26/12/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine