0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1913
Completion: 1922
Status: in use

Project Type

Function / usage: Road connection

Awards and Distinctions

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

length 128 km

Chronology

1913

Construction begins.

1922

Construction complete.

1963 — 1980

Portions demolished for Interstate 84 construction.

1983

Historic designation.

2000

Mosier Twin Tunnels reopened.

2007

Oneonta Tunnel excavated.

Participants

(role unknown)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    10001044
  • Published on:
    14/03/2007
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine