General Information
Duration of works: | 39 months |
---|---|
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Cut-and-cover method Drilling and blasting Excavation by excavator |
Location
Location: |
Waidhofen an der Ybbs, Lower Austria, Austria |
---|---|
Coordinates: | 47° 56' 52.50" N 14° 47' 31.70" E |
Coordinates: | 47° 57' 22.89" N 14° 46' 39.43" E |
Technical Information
Dimensions
total length | 1 485.32 m | |
number of tubes | 1 |
Participants
Client
Preparation of tender documents
Design
Contractor
Material supplier