0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Mabey Delta Bridge
Beginning of works: 13 July 2015
Completion: 7 August 2015
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Alpenrhein
Coordinates: 46° 51' 12.66" N    9° 29' 39.87" E
Show coordinates on a map

Technical Information

Dimensions

length 90 m
abutments number 2

Materials

truss steel
abutments reinforced concrete

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088684
  • Published on:
    08/06/2024
  • Last updated on:
    09/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine