General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nantes, Loire-Atlantique (44), Pays de la Loire, France |
---|---|
Crosses: |
|
Coordinates: | 47° 11' 34.39" N 1° 36' 48.79" W |
Technical Information
Dimensions
main span | 242 m | |
height | 52 m | |
total length | 1 563 m | |
number of spans | 22 | |
length of steel span | 162 m | |
deck | deck depth | 4.55 - 9 m |
deck width | 24.60 m | |
piers | pier height | 8.69 - 47 m |
Materials
deck |
composite steel-prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
- Ministère de l'Equipement, des Transports, du Logement, du Tourisme et de la Mer
- République Française
Client
Design
Architecture
- Cabinet Fraleu
- Pierre Loyer (architect)
- Philippe Fraleu (architect)
Structural engineering
Contractor
- Sepicos (foundations)
Civil works
Steel construction
Prestressing
Reinforcing steel
Lifting
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Complexe d'étanchéité - roulement Accopont M sur la travée métallique du pont de Cheviré (Loire-Atlantique). In: Travaux, n. 666 (June 1991), pp. 86-88. (1991):
- La construction du pont de Cheviré. In: Ouvrages d'art, n. 6 (July 1989), pp. 4. (1989):
- Effets thermiques lors de la pose de revêtements sur dalles orthotropes. In: Ouvrages d'art, n. 54 (March 2007), pp. 2-9. (2007):
- Franchir la Loire à Cheviré. In: Travaux, n. 642 (April 1989), pp. 30-41. (1989):
- Le Franchissement de la Loire à Cheviré. In: Ouvrages d'art, n. 9 (January 1991), pp. 2-4. (1991):
- About this
data sheet - Structure-ID
20002852 - Published on:
03/02/2002 - Last updated on:
05/02/2016