General Information
Name in local language: | Chemnitztalviadukt; Chemnitzer Viadukt |
---|---|
Beginning of works: | 1901 |
Completion: | 1909 |
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Steel bridge |
Structure: |
Truss arch bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | ca. 270 m | |
span lengths | 24.44 m - 33.84 m - 14.48 m - 20.51 m - 2 x 20.35 m - 33.84 m - 5 x 20.35 m | |
number of spans | 12 | |
number of tracks | 2 | |
track gauge | 1 435 mm |
Materials
deck |
steel
|
---|---|
piers |
steel
|
arches |
steel
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Begutachtung der historischen Lager des Chemnitzer Viadukts. In: Stahlbau, v. 93, n. 3 (February 2024), pp. 155-165. (2024):
- Ertüchtigungsplanung Chemnitzer Viadukt aus der Perspektive des Prüfingenieurs. In: Bautechnik, v. 101, n. 7 (July 2024), pp. 404-414. (2024):
- (2007): Monitoring of railway-bridges – an advanced component of maintenance and sustainability. Presented at: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, pp. 246-247.
- Numerische Untersuchungen als Teil der Begutachtung der historischen Lager des Chemnitzer Viadukts. In: Stahlbau, v. 93, n. 3 (February 2024), pp. 166-176. (2024):
- (2024): Technical rehabilitation and strengthening of the Chemnitz viaduct. Presented at: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, pp. 587-594.
- About this
data sheet - Structure-ID
20033143 - Published on:
08/11/2007 - Last updated on:
28/01/2025