General Information
Name in local language: | Terceira Travessia do Tejo |
---|---|
Completion: | 2030 |
Status: | project phase |
Project Type
Function / usage: |
High-speed rail bridge Motorway bridge / freeway bridge Railroad (railway) bridge |
---|---|
Structure: |
main bridge: Cable-stayed bridge with fan system approach viaducts: Warren type truss bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main bridge | ||
---|---|---|
total length | 1140.0 m | |
span lengths | 90.0 m - 210 m - 540.0 m - 210 m - 90.0 | |
number of spans | 4 |
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Third Tagus set for the off. In: Bridge Update, n. 75 (April 2008), pp. 1.
- (2010): Two large bridge projects in environmentally constrained areas. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 532-533.
- About this
data sheet - Structure-ID
20043316 - Published on:
02/02/2009 - Last updated on:
22/05/2020