General Information
Status: | in use |
---|
Project Type
Structure: |
Haunched girder bridge Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Chantada, Lugo, Galicia, Spain |
---|---|
Address: | LU-533 |
Crosses: |
|
Coordinates: | 42° 36' 56.90" N 7° 42' 45.12" W |
Technical Information
Dimensions
total length | 394.0 m | |
span lengths | 51 m - 88 m - 116 m - 88 m - 51 m | |
number of spans | 5 | |
deck | deck depth | 2.70 - 6.00 m |
deck width | 11.60 m | |
pier P2 | height | 86.0 m |
pier P3 | height | 70.0 m |
piers | width | 6.50 - 9.865 m |
thickness | 2.601 - 6.500 m | |
walkway width | 0.30 - 0.60 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
Structural engineering
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Tres puentes construidos por voladizos sucesivos. In: Hormigón y acero, v. 42, n. 180 (3rd Quarter 1991), pp. 75-80. (1991):
- About this
data sheet - Structure-ID
20076310 - Published on:
04/11/2018 - Last updated on:
04/11/2018