General Information
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Gimel-les-Cascades, Corrèze (19), Nouvelle-Aquitaine, France |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 45° 18' 21.97" N 1° 49' 40.14" E |
Technical Information
Dimensions
total length | 530 m | |
span lengths | 60 m - 4 x 100 m - 70 m | |
number of spans | 6 | |
height above valley floor or water | 90 m | |
pier height | 12 - 90 m | |
deck | deck width | 19.50 m |
Cost
cost of construction | French Franc 105 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
girders |
steel
|
Chronology
August 2000 | Construction begins. |
---|---|
Beginning of 2002 | Completion. |
Participants
Owner
Client
Design
Architecture
- Cabinet Fraleu
- Philippe Fraleu (architect)
- Pierre Loyer (architect)
Contractor
Steel construction
Relevant Web Sites
Relevant Publications
- Fin mars 2002, Dodin Eiffel rend le tablier du Chadon. In: Travaux, n. 788 (July - August 2002), pp. 35-36.
- Viaduc du Chadon: 90m de haut, 530 m de béton et d'acier. In: Travaux, n. 788 (July - August 2002), pp. 30-32.