General Information
Completion: | 2001 |
---|---|
Status: | in use |
Project Type
Structure: |
Network arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Cernavoda, Constanţa, Romania |
---|---|
Address: | Strada Garii |
Coordinates: | 44° 20' 17.51" N 28° 1' 43.15" E |
Technical Information
Dimensions
number of cables | 56 | |
weight | 1 325 t | |
arch | arch span | 172.50 m |
deck | deck width | 26.2 m |
Materials
deck |
steel
|
---|---|
arch |
steel
|
abutments |
reinforced concrete
|
Participants
Owner
Design
Structural engineering
Contractor
Subcontractor
Monitoring equipment
Launching
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Freyssinet cable-stayed structures. Freyssinet International, Vélizy-Villacoublay (France), 2004, pp. 52.
- La mise en place du pont de Cernavoda. In: Chantiers de France, n. 347 (February 2002), pp. 30-32.
- Mise en place du pont de Cernavoda. In: Freyssinet Magazine, n. 212 (September - December 2001), pp. 8-11.
- Un pont sur le Danube. In: Freyssinet Magazine, n. 207 (March 2000), pp. 19.
- About this
data sheet - Structure-ID
20003225 - Published on:
23/03/2002 - Last updated on:
05/02/2016