General Information

Beginning of works: 1974
Completion: 1975
Duration of works: 14 months
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Rhone River
Coordinates: 45° 20' 24.83" N    4° 47' 8.07" E
Show coordinates on a map

Technical Information

Dimensions

total length 174.50 m
span lengths 81.50 m - 95 m
number of spans 2
bridge surface 1 412 m²
deck deck width 8 m
web thickness 0.36 m
thickness of bottom flange 0.18 - 1.00 m

Quantities

deck concrete volume 1 050 m³
prestressing steel 58 kg/m³
reinforcing steel 73.5 kg/m³

Cost

cost of construction French Franc 2 797 000

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20019970
  • Published on:
    12/03/2006
  • Last updated on:
    05/02/2016