• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Carentan Canal Bridge

General Information

Beginning of works: 1992
Completion: 1994
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Canal bridge
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Route Nationale RN 13
Carries:
  • Haut Dyck Canal
Coordinates: 49° 18' 51.00" N    1° 13' 49.00" W
Show coordinates on a map

Technical Information

Dimensions

total length 615 m

Cost

cost of construction French Franc 120 000 000

Materials

deck prestressed concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003104
  • Published on:
    16/02/2002
  • Last updated on:
    05/02/2016