General Information
Project Type
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Structure: |
Box girder bridge |
Material: |
Steel bridge |
Structure: |
Haunched girder bridge |
Construction method: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Milton Keynes, Buckinghamshire, South East England, England, United Kingdom |
---|---|
Crosses: |
Grand Union Canal (1801)
|
Coordinates: | 52° 2' 51.22" N 0° 44' 2.79" W |
Technical Information
Dimensions
length | 35 m | |
walkway width | 3.200 m |
Materials
deck |
steel
|
---|---|
abutments |
reinforced concrete
|
railing |
weathering steel
|
ramps |
gabions
|
Participants
Owner
Architecture
Structural design
Structural engineering
Steel construction
Relevant Web Sites
Relevant Publications
- (2022): An Unusual 3-way Footbridge – Concept and Delivery. Presented at: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- About this
data sheet - Structure-ID
20083753 - Published on:
20/09/2022 - Last updated on:
20/09/2022