0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1899
Completion: September 1900
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Awards and Distinctions

Location

Location: , , ,
Crosses:
  • Vienne River
Coordinates: 46° 48' 49.42" N    0° 32' 14.86" E
Show coordinates on a map

Technical Information

Dimensions

main span 50 m
length of side spans 2 x 40 m
total length 144 m
number of spans 3
arches rise 4.0 m / 4.8 m / 4.0 m
deck deck width 8.0 m

Materials

deck reinforced concrete
arches reinforced concrete

Chronology

August 1899

Foundation works begin.

29 March 1900
— 5 April 1900

Load testing

5 November 1900

Main structural works are completed.

15 December 1900

Falsework is removed.

Participants

Design
Construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000489
  • Published on:
    13/11/1999
  • Last updated on:
    26/08/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine