General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Lyon, Rhône (69), Auvergne-Rhône-Alpes, France Caluire-et-Cuire, Rhône (69), Auvergne-Rhône-Alpes, France |
---|---|
Underneath of: |
|
Part of: | |
Connects to: |
Tranchée Demonchy
|
Coordinates: | 45° 47' 29" N 4° 48' 51" E |
Coordinates: | 45° 47' 17" N 4° 51' 35" E |
Technical Information
Dimensions
interior diameter | 9.82 m | |
excavation diameter | 11.02 m | |
total excavated section | 95 m² | |
northern tube | length | 3 252 m |
southern tube | length | 3 230 m |
Chronology
1994 — 1996 | Construction of the north tube. |
---|
Participants
Owner
Client
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Boulevard Périphérique Nord de Lyon (BPNL). Tunnel de Caluire - Tube Nord. Long: 3252 ml Ø foré = 11,02 m. In: Tunnels et Ouvrages Souterrains, n. 150 (November - December 1998), pp. Fiche No. 73.
- Boulevard Périphérique Nord de Lyon (BPNL). Tunnel de Caluire - Tube Sud. Long: 3230 ml Ø foré = 11,02 m. In: Tunnels et Ouvrages Souterrains, n. 150 (November - December 1998), pp. Fiche No. 74.
- Congélation des sols pour une liaison entre deux tubes du Boulevard périphérique Nord de Lyon (France). Presented at: Symposium international sur l'Amélioration des Sols En Place ASEP-GI 2004, pp. 387-394. (2004):
- GIE Lyon Nord. Projet Centre. Le tunnel de Caluire - I - Les travaux préparatoires tranchée Pierre-Baizet et les usines de ventilation. In: Travaux, n. 723 (September 1996), pp. 43-48. (1996):
- GIE Lyon Nord. Projet Centre. Le tunnel de Caluire - II - Le tunnelier et les travaux de creusement. In: Travaux, n. 723 (September 1996), pp. 49-51. (1996):
- About this
data sheet - Structure-ID
20008212 - Published on:
13/02/2003 - Last updated on:
28/05/2021