General Information
Name in local language: | Calandbrug |
---|---|
Completion: | 6 June 1969 |
Status: | in use |
Project Type
Structure: |
Vertical lift bridge Pony truss bridge Warren type truss bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
Road bridge Railroad (railway) bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rotterdam, South Holland, Netherlands |
---|---|
Coordinates: | 51° 54' 5" N 4° 13' 39" E |
Technical Information
Dimensions
width | 37 m | |
total length | 354 m | |
number of tracks | 2 | |
number of lanes | 2 | |
vertical navigation clearance | max. 49.72 m | |
horizontal navigation clearance | 80 m + 46.00 m |
Materials
piers |
reinforced concrete
|
---|---|
deck truss |
steel
|
abutments |
reinforced concrete
|
Chronology
2 November 2021 | Rail traffic is re-routed over the Theemsweg route making the rail part of the bridge superfluous. The tracks are later disconnected from the network. |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Strengthening the Caland Bridge Rotterdam for Increased Load. Presented at: IABSE Symposium: Responding to Tomorrow's Challenges in Structural Engineering, Budapest, Hungary, 13-15 September 2006, pp. 9-16. (2006):
- About this
data sheet - Structure-ID
20013199 - Published on:
02/09/2004 - Last updated on:
02/06/2023