0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2018
Completion: 13 August 2019
Status: in use

Project Type

Location

Location: , ,
Replaces: Bystrzyckie Lake Footbridge (1968)
Coordinates: 50° 45' 7.03" N    16° 25' 5.70" E
Show coordinates on a map

Technical Information

Dimensions

total length 125.60 m
span lengths 22.00 m - 80.00 m
number of spans 2
abutment 1 height 4.54 m
length 9.00 m
abutment 2 height 6.64 m
length 13.15 m
cables strands per cable 31
number 4
deck deck depth 0.32 - 0.35 m
deck width 2.40 - 4.90 m
length of precast segments 1.00 m / 2.00 m
walkway width 2.00 - 4.50 m
pier height 8.64 m
thickness 0.70 m

Materials

cables steel
deck precast prestressed concrete
abutments reinforced concrete
pier reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20082361
  • Published on:
    21/02/2022
  • Last updated on:
    21/02/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine