General Information
Completion: | 1968 |
---|---|
Status: | demolished |
Project Type
Structure: |
Single-span two-tower suspension bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Zagórze Śląskie, Lower Silesian Voivodeship, Poland |
---|---|
Replaced by: |
Bystrzyckie Lake Footbridge (2019)
|
Coordinates: | 50° 45' 7.03" N 16° 25' 5.70" E |
Technical Information
Dimensions
walkway width | 2.00 m |
Materials
deck |
steel
|
---|---|
pylons |
steel
|
deck flooring |
wood
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2022): Stress Ribbon Footbridge over the Bystrzyckie Lake in Zagórze Śląskie – Design and Construction. Presented at: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- About this
data sheet - Structure-ID
20072354 - Published on:
02/01/2017 - Last updated on:
21/02/2022