0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1996
Completion: 1998
Status: in use

Project Type

Location

Location: , , ,
Address: Büttnerstraße
Crosses:
  • Mittellandkanal
Part of:
Replaces: Büttnerstrasse Bridge (1913)
Coordinates: 52° 24' 39.14" N    9° 43' 47.58" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 13.81 m - 69.02 m - 13.81 m
number of spans 3
total width 11.60 m

Cost

cost of construction German Mark 6 200 000

Materials

deck composite steel-reinforced concrete
arch steel

Participants

Structural engineering
Checking engineering
  • Peil (checking engineer)
Main contractor
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008696
  • Published on:
    21/03/2003
  • Last updated on:
    16/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine