0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bundimulinga-Kijumbu Trail Bridge

General Information

Beginning of works: 8 November 2021
Completion: 2022
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the River Nyahuka river.
Coordinates: 0° 40' 24.78" N    29° 59' 47.61" E
Show coordinates on a map

Technical Information

Dimensions

span 83 m

Materials

cables steel wire
deck steel
anchorages reinforced concrete

Notes

The bridge built by Bridges to Prosperity serves around 23520 people.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084810
  • Published on:
    27/01/2023
  • Last updated on:
    07/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine