General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Brünn, Hildburghausen (Kreis), Thuringia, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 27' 21.40" N 10° 51' 27.29" E |
Technical Information
Dimensions
main span | 50.8 m | |
total length | 696 m | |
span lengths | 40.4 m - 12 x 50.8 m - 46.0 m | |
number of spans | 14 | |
height above valley floor or water | ma x . 23 m | |
deck | deck depth | 3.6 m |
deck width | 2 x 14.25 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Architecture
-
Hentschel - Oestreich Architekten
- Axel Oestreich (architect)
Structural engineering
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20033661 - Published on:
12/12/2007 - Last updated on:
05/02/2016