0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1992
Status: in use

Project Type

Location

Location: , ,
Part of:
See also: Bombay Footbridge (1992)
Coordinates: 48° 48' 17.76" N    9° 11' 5.76" E
Show coordinates on a map

Technical Information

Dimensions

deck deck slab thickness 0.30 m

Materials

pylon steel tubes
piers steel
deck slab reinforced concrete
abutments reinforced concrete

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008423
  • Published on:
    26/02/2003
  • Last updated on:
    06/07/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine