0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1975
Completion: 1976
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , , ,
Carries:
  • Autobahn A81
Part of:
Coordinates: 48° 16' 14.01" N    8° 38' 18.19" E
Show coordinates on a map

Technical Information

Dimensions

total length 119 m
span lengths 37 m - 45 m - 37 m
number of spans 3
pier height 22 m
total width 30.50 m
deck deck depth 3.20 m

Materials

deck prestressed concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011018
  • Published on:
    14/12/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine