General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Stralsund, Vorpommern-Rügen, Mecklenburg-Western Pomerania, Germany |
---|---|
Coordinates: | 54° 17' 55.28" N 13° 5' 10.61" E |
Technical Information
Dimensions
total length | 446.58 m | |
span lengths | 34.07 m - 50.80 m - 46-74 m - 46.99 m - 44.48 m - 4 x 47.00 m -35.50 m | |
number of spans | 10 | |
bridge surface | 15 370 m² | |
deck | deck width | 29.50 m |
Quantities
deck | concrete volume | 14 171 m³ |
reinforcing steel | 2 181 t | |
transverse prestressing | 11.5 t | |
longitudinal prestressing | 543 t | |
substructure | concrete volume | 5 543 m³ |
concrete volume | 1 674 m³ | |
reinforcing steel | 777 t (BSt 500 S) |
Cost
cost of construction | Euro 22 300 000 |
Materials
deck |
prestressed concrete
|
---|
Chronology
March 2000 | Beginning of works. |
---|---|
November 2002 | Completion. |
Participants
Owner
Client
Original design
Structural engineering
Geotechnical engineering
Checking engineering
- Uwe Schmiedel (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2003. Deutscher Bundes-Verlag, Cologne (Germany), 2003, pp. 63-80.
- About this
data sheet - Structure-ID
20011053 - Published on:
22/12/2003 - Last updated on:
21/12/2016