General Information
Completion: | 12 November 1938 |
---|---|
Status: | out of service |
Project Type
Structure: |
T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Support conditions: |
Structurae Plus/Pro - Subscribe Now! |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
1991 |
for registered users |
---|
Location
Location: |
Oelde, Warendorf (Kreis), North Rhine-Westphalia, Germany Beckum, Warendorf (Kreis), North Rhine-Westphalia, Germany |
---|---|
Crossed: |
|
Part of: | |
Coordinates: | 51° 47' 55.87" N 8° 5' 41.36" E |
Coordinates: | 51° 47' 29.82" N 8° 4' 32.78" E |
Technical Information
Dimensions
span | 33.00 m | |
number of spans | 1 | |
abutments | number | 2 |
deck | deck depth | 1.87 m |
deck width | 6.40 m |
Materials
deck slab |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
prestressed concrete
|
Notes
First prestressed concrete bridge in Germany. Based on Eugène Freyssinet's patents for which Wayss & Freytag was sole licensee in Germany at the time.
Participants
Engineering
- Gotthard Franz (engineer)
Consulting engineers
- Eugène Freyssinet (consulting engineer)
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Betonbau in Forschung und Praxis, Festschrift für G. Iványi. Eine frühe Spannbeton-Straßenbrücke nach dem Verfahren Freyssinet. Verlag Bau+Technik, Düsseldorf (Germany), pp. 153-159. (1999):
- Gotthard Franz. In: Beton- und Stahlbetonbau, v. 86, n. 1 (January 1991), pp. 19-22. (1991):
- Les ponts modernes - vingtième siècle. Picard Éditeur, Paris (France), pp. 137. (1995):
- About this
data sheet - Structure-ID
20003543 - Published on:
10/06/2002 - Last updated on:
15/05/2022