General Information
Project Type
Structure: |
Nielsen-Lohse bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Hanover, Region Hannover, Lower Saxony, Germany |
---|---|
Address: | Beneckeallee (K 13) |
Crosses: |
|
Part of: |
|
Replaces: |
Beneckeallee Bridge (1913)
|
Coordinates: | 52° 25' 8.97" N 9° 42' 23.65" E |
Technical Information
Dimensions
arch span | 63.83 m | |
total width | 21.50 m |
Cost
cost of construction | German Mark 6 900 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
arch |
steel
|
Chronology
June 1994 | Construction begins. |
---|---|
August 1995 | Opened to traffic. |
December 1995 | Completion. |
Participants
Client
Architecture
Structural engineering
Checking engineering
- Rolf Kindmann (checking engineer)
Construction
- Gebr. Echterhoff GmbH & Co. KG (substructure)
Main contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ingenieurbauwerke der Wasserstraßen. Brücken, Schleusen, Hebewerke - Ein Fachkompendium der Ingenieurbaukunst in Deutschland. Bundesanstalt für Wasserbau, Karlsruhe (Germany), pp. 100-101.
- Stadtlandschaft und Brücken in Hannover. Der Mittellandkanal als moderner Schifffahrtsweg. Schlütersche Verlag, Hanover (Germany), pp. 126-127. (2000):
- About this
data sheet - Structure-ID
20008692 - Published on:
21/03/2003 - Last updated on:
05/02/2016