0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Brücke Bahnknoten Wiederitzsch

General Information

Beginning of works: 1996
Completion: 1998
Status: in use

Project Type

Function / usage: Railroad (railway) bridge
Material: Steel bridge
Structure: main bridge:
Through truss bridge
Construction method: main bridge:
Longitudinal launching
Support conditions: Structurae Plus/Pro - Subscribe Now!
Structure: main bridge:
Warren type truss bridge
approach viaduct:
Girder bridge

Location

Location: , ,
Coordinates: 51° 23' 25.32" N    12° 23' 28.95" E
Show coordinates on a map

Technical Information

Dimensions

main span 137 m

Quantities

structural steel 1 700 t

Materials

truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20013169
  • Published on:
    31/08/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine