General Information
Project Type
Structure: |
Tied-arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Berlin-Baumschulenweg, Treptow-Köpenick, Berlin, Germany Berlin-Neukölln, Neukölln, Berlin, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 52° 27' 33.49" N 13° 27' 27.58" E |
Technical Information
Dimensions
bridge surface | 3 894 m² | |
total width | 34.74 m | |
roadway / carriageway width | 2 x 14.90 m | |
arches | arch span | 112.10 m |
Design Loads
live load | Brückenklasse 60/30 | |
design code(s) | DIN 1072 |
Cost
cost of construction | Euro 16 800 000 |
Materials
arches |
steel
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Original design
Architecture
Structural engineering
Checking engineering
- Heinz Schmackpfeffer (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Neubau der BAB A113 (neu). Entwurf, Ausschreibung und Vergabe des Neuköllner Autobahndreiecks und der Bogenbrücke über den Britzer Verbindungskanal. In: Stahlbau, v. 69, n. 11 (November 2000), pp. 823-832. (2000):
- About this
data sheet - Structure-ID
20001352 - Published on:
11/03/2001 - Last updated on:
24/08/2020