Advertisement
Cable-stayed bridges with harp system: Case Studies
- Structures
- Bridges and Viaducts
- Longitudinal bridge systems
- Cable-stayed bridges
- Cable-stayed bridges with harp system
Case Studies & Reports
The following reports and case studies on "Cable-stayed bridges with harp system" are available:
Expansion Joint Opens Horizontally in the Middle of the Bridge
The new Clyde Crossing in Glasgow is a double swing bridge that opens at the centre, thanks in part to the special expansion joint from MAURER (Typ ... more
Baerl Bridge: 90 m of expansion joints replaced
During regular maintenance of the bridge between Duisburg-Beeckerwerth and -Baerl, the 30 year old expansion joints had to be replaced while keepin ... more
Hong Kong-Zhuhai-Macao Bridge resists laminar flows with Tuned Mass Dampers
Presently, and starting from Hong Kong, the 35 km long Hong Kong-Zhuhai-Macao Bridge is being constructed over the delta of the Pearl River. The br ... more
Inspection carriage for the Leverkusen Rhine Bridge
The Leverkusen Rhine Bridge was built in the first half of the 1960s. It is 690 m long and constructed as a cable-stayed bridge with two pylons. W ... more
Crusell cable-stayed bridge - BIM changed approach
The recently completed Crusell cable-stayed bridge in Helsinki will go down in history as the first bridge to be built making extensive use of Bu ... more