0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Talbrücke Bräubach
Beginning of works: 2013
Completion: 2015
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A7
Part of:
Coordinates: 49° 39' 15.63" N    10° 8' 12.06" E
Show coordinates on a map

Technical Information

Dimensions

total length 248.00 m
span lengths 40.00 m - 3 x 56.00 m - 40.00 m
number of spans 5
bridge surface 7 775 m²
height above valley floor or water 43 m
total width 31.35 m
deck deck depth 1.70 - 3.20 m
piles diameter 1.20 m

Quantities

concrete volume 11 400 m³
prestressing steel 300 t
reinforcing steel 1 580 t
piles total length of piles 1 640 m

Cost

cost of construction ca. Euro 15 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2016): Chronik des Brückenbaus. In: Curbach, Manfred (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310.
  • About this
    data sheet
  • Structure-ID
    20009084
  • Published on:
    20/04/2003
  • Last updated on:
    21/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine