General Information
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
U-shaped girder bridge |
Material: |
Weathering steel bridge |
Support conditions: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Longitudinal launching |
Awards and Distinctions
2023 |
entry
for registered users |
---|
Location
Location: |
Callander, Stirling, Scotland, United Kingdom |
---|---|
Coordinates: | 56° 14' 56.32" N 4° 11' 15.20" W |
Technical Information
Dimensions
width | 2 m | |
total length | 21.70 m | |
span | 21.4 m | |
deck | deck depth | 1.500 m |
Cost
cost of construction | Pound sterling 175 000 |
Materials
girders |
weathering steel
|
---|---|
deck flooring |
fiber-reinforced polymer (FRP)
|
Participants
Design
Technical advisor to the owner
Structural engineering
Checking engineering
Steel construction
Relevant Web Sites
Relevant Publications
- (2024): Bracklinn Falls Footbridge: efficient modular design. Presented at: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, pp. 443-450.
- Modular by necessity - Bracklinn falls footbridge. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, pp. 1-29. :
- About this
data sheet - Structure-ID
20089392 - Published on:
09/09/2024 - Last updated on:
09/09/2024