General Information
Name in local language: | Böbertalbrücke |
---|---|
Beginning of works: | October 2007 |
Completion: | December 2009 |
Duration of works: | 27 months |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Haunched girder bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hörselberg-Hainich, Wartburgkreis, Thuringia, Germany |
---|---|
Part of: | |
Coordinates: | 50° 59' 55" N 10° 24' 44" E |
Technical Information
Dimensions
total length | 200.00 m | |
span lengths | 50.00 m - 85.00 m - 65.00 m | |
number of spans | 3 | |
bridge surface | 7 200 m² | |
total width | 36.70 m | |
deck | on-center distance between girders | 9.00 m |
girder depth | max. 4.80 m |
Quantities
deck | structural steel | 1 650 t |
concrete volume | 3 177 m³ | |
reinforcing steel | 841 t | |
substructure | concrete volume | 3 636 m³ |
reinforcing steel | 411 t |
Cost
cost of construction | Euro 5 950 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Architecture
- Ursulina Schüler-Witte (architect)
- Ralf Schüler (architect)
Structural engineering
- HOCHTIEF Consult Infrastructure
- Ingenieurgemeinschaft Setzpfandt GmbH & Co. KG
- KREBS+KIEFER Ingenieure GmbH
Geotechnical/geological experts
Checking engineering
- A. Rinke (checking engineer)
Co-contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2011. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2011, pp. 53-80.
- About this
data sheet - Structure-ID
20064772 - Published on:
20/03/2013 - Last updated on:
05/02/2016