General Information
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Construction method: |
In-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wuppertal, North Rhine-Westphalia, Germany |
---|---|
Address: | Parkstraße (L 419) |
Crosses: |
|
Part of: | |
Coordinates: | 51° 14' 21.85" N 7° 13' 50.20" E |
Technical Information
Dimensions
width | 14.7 m | |
height | 50 m | |
total length | 296 m | |
span lengths | 15.5 m - 3 x 16.0 m - 150 m - 16.0 m - 19.0 m - 2 x 16.0 m - 15.5 m | |
number of spans | 10 | |
arch | width | 11.3 m |
rise | 27.0 m | |
arch span | 150 m |
Materials
deck |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
arch |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Notes
Last great arch bridge in Germany built on falsework.
Participants
Design
- Hellmut Homberg (engineer)
Structural engineering
Architectural consulting
- Gerd Lohmer (architect)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Beton- und Monierbau Aktiengesellschaft, 1889 - 1964. Düsseldorf (Germany), 1964, pp. 2.
- About this
data sheet - Structure-ID
20005501 - Published on:
25/09/2002 - Last updated on:
21/10/2016