General Information
Name in local language: | Überführung eines Wirtschaftsweges bei Bliesendorf |
---|---|
Completion: | 1995 |
Status: | in use |
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Two-span continuous girder bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Beelitz, Potsdam-Mittelmark, Brandenburg, Germany |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 52° 19' 11.57" N 12° 51' 21.41" E |
Technical Information
Dimensions
total length | 59.50 m | |
span lengths | 2 x 29.40 m | |
number of spans | 2 | |
bridge surface | 353 m² | |
roadway / carriageway width | 5.00 m | |
crossing angle | 75.23 gon | |
abutments | number | 2 |
deck | deck depth | 1.35 m |
deck width | 6.00 m | |
roadway / carriageway width | 5.00 m | |
number of longitudinal girders | 2 | |
pier | thickness | 1.00 m |
number | 1 |
Design Loads
live load | Brückenklasse 30/30 | |
design code(s) | DIN 1072 |
Cost
cost of construction | German Mark 1 100 000 | |
cost of construction per m² | German Mark 3 120 |
Materials
piers |
reinforced concrete
|
---|---|
foundations |
reinforced concrete
|
deck slab |
reinforced concrete
(B 45)
|
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
(B 55)
|
Participants
Owner
Client
Original design
Architecture
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Sammlung Straßenbrücken. Dokumentation 1997. Verkehrsblatt-Verlag, Dortmund (Germany), 1997, pp. 117-119.
- About this
data sheet - Structure-ID
20000796 - Published on:
16/06/2000 - Last updated on:
05/02/2016