0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: July 1989
Completion: September 1991
Duration of works: 27 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Bidouze River
Carries:
  • Autoroute A64
Part of:
Coordinates: 43° 31' 27.74" N    1° 12' 22.39" W
Show coordinates on a map

Technical Information

Dimensions

total length 268 m
span lengths 18.10 m - 67.20 m - 18.10 m
number of spans 3
deck deck depth 0.65 m
deck width 20.50 m

Cost

cost of construction French Franc 81 461 000

Materials

piers reinforced concrete
deck slab prestressed concrete
abutments reinforced concrete

Chronology

July 1989
— September 1991

Construction phase (27 months).

Participants

Design
Architecture
Co-contractor
Stay cables
Monitoring
Monitoring equipment

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003128
  • Published on:
    17/02/2002
  • Last updated on:
    02/12/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine