General Information
Completion: | 1989 |
---|---|
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Reinforced concrete bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Location
Technical Information
Dimensions
total length | 411.0 m | |
arch span | 235.0 m |
Materials
arch |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- 温泉地帯における長大RCアーチ橋の耐震補強─大分自動車道・別府明礬橋─ (Seismic Retrofit of Long-Span Reinforce Concrete Arch Bridge Located in the Hot Spring Area—Beppu-Myoban Bridge in the Oita Expressway—). In: Concrete Journal (JCI), v. 53, n. 6 ( 2015), pp. 564-569. (2015):
- About this
data sheet - Structure-ID
20006617 - Published on:
07/11/2002 - Last updated on:
02/01/2018