0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Centrala hidroelectrica
Beginning of works: 1907
Completion: 1910
Status: in use

Project Type

Location

Location: , ,
Impounds:
  • Bega Canal
Coordinates: 45° 45' 29.27" N    21° 15' 54.86" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Participants

Architecture

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20019804
  • Published on:
    04/03/2006
  • Last updated on:
    23/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine