General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Villeneuve-sur-Lot, Lot-et-Garonne (47), Nouvelle-Aquitaine, France |
---|---|
Address: | Boulevard du 14 juillet |
Crosses: |
|
Coordinates: | 44° 24' 30.60" N 0° 42' 4.28" E |
Technical Information
Dimensions
total length | 224 m | |
span lengths | 45 m - 75 m - 45 m - 23 m - 21 m - 15 m | |
number of spans | 6 | |
deck | deck width | 12.3 m |
deck depth of main span | 2.2 - 4.5 m | |
deck depth at abutments | 0.6 m |
Materials
deck |
prestressed concrete
|
---|
Chronology
November 1991 | Construction begins. |
---|---|
March 1993 | End of construction. |
Participants
Owner
Client
Design
Architecture
- Berdj Mikaelian (architect)
Structural engineering
Checking engineering
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Exécution du pont de Villeneuve-sur-Lot. In: Ouvrages d'art, n. 15 (July 1993), pp. 5-7. (1993):
- About this
data sheet - Structure-ID
20005483 - Published on:
25/09/2002 - Last updated on:
05/02/2016