General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Primorje-Gorski Kotar, Croatia |
---|---|
Coordinates: | 45° 19' 0.35" N 14° 42' 38.68" E |
Technical Information
Dimensions
width | 2 x 12.05 m | |
total length | 520 m | |
span lengths | 42.63 m - 8 x 50 m - 42.63 m | |
number of spans | 10 |
Cost
cost of construction | United States dollar 6 563 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Excerpt from Wikipedia
Bajer Bridge is located between the Vrata and Oštrovica interchanges of the A6 motorway in Gorski Kotar, Croatia, spanning Lake Bajer. It is 520 metres (1,710 ft) long. The bridge consists of two parallel structures: The first one was completed in 1995, and the second one in 2008. The bridge is tolled within the A6 motorway ticket system and there are no separate toll plazas associated with use of the bridge. The bridge was constructed by Viadukt.
Structure description
At this location the motorway route follows a horizontal curve of 2,006-metre (6,581 ft) radius. Transversal grade of the deck is constant and equal to 2.5%, while elevation grade of the bridge is constant at 0.835%, sloping down towards Oštrovica. The bridge is a box girder structure supporting the deck across 10 spans: 42.63 m (139.9 ft) + 8 x 50.16 m (164.6 ft) + 42.63 m (139.9 ft). Since the elevation of the bridge lies 41 metres (135 ft) above the average water level of Lake Bajer, incremental launching of the bridge was executed without use of any auxiliary piers. The main longitudinal girders comprise box cross-section and were divided in 19 sections each (2 x 27.94 m (91.7 ft) + 15 x 25.08 m (82.3 ft) + 2 x 27.94 m (91.7 ft)). Piers of the bridge comprise a 6.6-metre (22 ft) by 3.1-metre (10 ft) box cross-section with 30 centimetres (12 in) thick walls. Bridge abutments and shore piers have shallow foundations, while those piers located within the lake have foundations executed on groups of six piles each. The piles are circular in cross section, 1.5 metres (4 ft 11 in) in diameter, and are connected with beam cap slabs measuring 8.5 m (28 ft) x 9.5 m (31 ft) x 2.5 m (8 ft 2 in).
Text imported from Wikipedia article "Bajer Bridge" and modified on July 22, 2019 according to the CC-BY-SA 4.0 International license.