General Information
Status: | in use |
---|
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Prestressed concrete bridge |
Awards and Distinctions
2008 |
entry
for registered users |
---|
Location
Location: |
Heilbad Heiligenstadt, Eichsfeld (Kreis), Thuringia, Germany |
---|---|
Crosses: |
|
Crosses: |
A 38 Motorway (Germany) (2009)
|
Coordinates: | 51° 23' 46.74" N 10° 5' 5.37" E |
Technical Information
Dimensions
total length | 55.3 m | |
number of spans | 3 | |
arch span | 40.16 m | |
girder depth | 0.9 - 1.25 m |
Materials
deck |
prestressed concrete
|
---|---|
arch |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20079357 - Published on:
06/05/2020 - Last updated on:
01/09/2020