General Information

Beginning of works: 1969
Completion: May 1974
Status: in use

Project Type

Location

Location: , , ,
, , , ,
Crosses:
  • Avon
Coordinates: 51° 29' 19.80" N    2° 41' 34.77" W
Show coordinates on a map

Technical Information

Dimensions

main span 164 m
total length 1 388 m

Materials

piers reinforced concrete
deck slab reinforced concrete
girders steel

Excerpt from Wikipedia

The Avonmouth Bridge is a road bridge that carries the M5 motorway over the River Avon into Somerset near Bristol, England. The main span is 538 ft (164 m) long, and the bridge is 4,554 ft (1,388 m) long, with an air draught above mean high water level of 98.4 ft (30 m). It also has a separate footpath and cycleway which connects with Avonmouth station.

Construction

The bridge was built with three lanes each way, with full hard shoulders. In 2002-04, it was widened to four lanes each way, with the result that the hard shoulders are no longer of full width.

The bridge was built to allow tall ships underneath. This gave the bridge steep gradients that cause heavy vehicles to slow down, resulting in congestion during rush hour and the summer tourist season: traffic can back up both on the bridge and on the approaches.

The construction contract was let to Fairfield-Mabey and commenced in 1969; Fairfield-Mabey placed a sub-contract with Tarmac Civil Engineering for the foundations, piers and deck concreting works.

Surface

The approach and initial climb up the bridge have a smooth asphalt surface; however, on the top of the bridge the surface was uneven and bumpy when it was built. In September 2006, it was announced that the entire bridge would be resurfaced, only five years after the last resurfacing. This was completed in November 2009 by the construction firm Stirling Lloyd. However, the surfacing was carried out by Stirling Lloyd's partners Aeschlimann AG from Switzerland using its own workforce and also importing all the plant used. A new type of asphalt called Gussasphalt was used on the bridge deck, The project was managed by Stirling Lloyd's Darren Holmes. In addition to having a smooth, skid-resistant finish, it requires no compaction and can be applied in very thin layers (Each layer only 25 mm thick), thus reducing the weight added to the bridge. It is also flexible and as a result should last longer than the previous resurfacing.

Text imported from Wikipedia article "Avonmouth Bridge" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.

Participants

Design
Contractor
Resident engineering
Strengthening (1999)
Client
Consulting engineers
Contractor
Steel construction

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005069
  • Published on:
    16/09/2002
  • Last updated on:
    22/02/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine