General Information
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Urt, Pyrénées-Atlantiques (64), Nouvelle-Aquitaine, France Bardos, Pyrénées-Atlantiques (64), Nouvelle-Aquitaine, France |
---|---|
Address: | A64 |
Carries: |
|
Part of: | |
Coordinates: | 43° 29' 7.67" N 1° 15' 35.74" W |
Technical Information
Dimensions
width | 2 x 9.75 m | |
total length | 442 m | |
span lengths | 26 m - 12 x 32.5 m - 26 m | |
number of spans | 14 | |
height above valley floor or water | 11 m | |
pier height | 9 m | |
girder depth | 1.30 m | |
depth of foundations | 11 - 32 m |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Concessionaire
Client
Architecture
-
Alain Spielmann Architecte
- Alain Spielmann (architect)
Steel construction
Concrete construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20009706 - Published on:
27/07/2003 - Last updated on:
15/04/2016