0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Talbrücke Arensburg
Beginning of works: 1990
Completion: 1992
Duration of works: 2 years
Status: in use

Project Type

Location

Location: , , ,
, , ,
Carries:
  • Autobahn A2
Part of:
Is supported by: Arensburg Bridge (1939)
Coordinates: 52° 13' 12.44" N    9° 7' 0.73" E
Show coordinates on a map

Technical Information

Dimensions

total length 568.00 m
span lengths 22.87 m - 21.50 m - 26 x 19.15 m - 25.73 m
number of spans 29
deck deck width 18.7 m

Quantities

concrete volume 8 334 m³
prestressing steel 290 t
reinforcing steel 913 t

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction ca. German Mark 13 900 000
cost of construction per m² German Mark 1 330

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001139
  • Published on:
    25/11/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine