General Information
Name in local language: | Viaducto Anzo 2 |
---|---|
Completion: | 2009 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
High-speed rail bridge |
Construction method: |
Incremental launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Silleda, Pontevedra, Galicia, Spain |
---|---|
Part of: | |
Coordinates: | 42° 43' 24.85" N 8° 12' 33.08" W |
Technical Information
Dimensions
total length | 732.40 m | |
span lengths | 51.20 m - 9 x 70.00 m - 51.20 m | |
number of spans | 11 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
-
Apia XXI
- Marcos J. Pantaleón Prieto (designer)
- Óscar Ramón Ramos Gutiérrez (designer)
Checking engineering
Contractor
Prestressing
Pot bearings
Launching
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaductos sobre Río Deza y Anzo 2. In: Hormigón y acero, v. 62, n. 259 (1st Quarter 2011), pp. 61-74. (2011):
- About this
data sheet - Structure-ID
20075000 - Published on:
27/03/2018 - Last updated on:
27/03/2018