General Information
Other name(s): | Anna-Nemitz-Brücke |
---|---|
Completion: | 2003 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Girder bridge |
Location
Location: |
Berlin-Baumschulenweg, Treptow-Köpenick, Berlin, Germany |
---|---|
Address: | Neue Späthstraße |
Crosses: |
|
Part of: | |
Connects to: |
Neue Späthbrücke (2002)
|
Coordinates: | 52° 27' 15.49" N 13° 27' 40.50" E |
Technical Information
Dimensions
span | 32.70 m | |
deck width | 28.70 m | |
bridge surface | 962 m² | |
girder depth | 1.62 m | |
total width | 29.60 m | |
crossing angle | 100 gon |
Design Loads
live load | Brückenklasse 60/30 | |
design code(s) | DIN 1072 |
Cost
cost of construction | Euro 960 000 |
Participants
Owner
Client
Design
Architecture
Structural engineering
Checking engineering
- Gerhard Sedlacek (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20025351 - Published on:
21/11/2006 - Last updated on:
24/08/2020