General Information
Name in local language: | Puente-canal Río Anisacate |
---|---|
Beginning of works: | 2015 |
Completion: | June 2017 |
Status: | in use |
Project Type
Function / usage: |
Aqueduct bridge |
---|---|
Material: |
Prestressed concrete bridge |
Construction method: |
Incremental launching |
Structure: |
Girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Anisacate, Córdoba, Argentina |
---|---|
Location description: | The bridge crosses the Río Segundo - Xanaes near Anisacate. |
Coordinates: | 31° 46' 6.18" S 64° 20' 44.98" W |
Technical Information
Dimensions
total length | 1 100 m | |
span lengths | 20 x 50 m - 2 x 36 m - 28 m | |
number of spans | 23 | |
girder depth | 3.50 m | |
girder width | 4.00 m |
Cost
cost of construction | 97 948 947 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
foundations |
reinforced concrete
|
abutments |
reinforced concrete
|
launching nose |
steel
|
Chronology
18 August 2016 | The first section is launched. |
---|---|
17 December 2016 | Launching of last section of the deck. |
15 June 2017 | Planned inauguration. |
Participants
Owner
- Ministerio de Agua, Ambiente y Servicios Públicos (Córdoba, Argentina)
- Provincia de Córdoba (Argentina)
Client
Design
Structural engineering
Geotechnical survey
Measurement concept / monitoring
Contractor
Foundations
Prestressing
Concrete supplier
Expansion joints
Launching
Relevant Web Sites
Relevant Publications
- Experiencia constructiva "Puente‐Canal Anisacate" hormigón curado a vapor y trasladado por empuje. Presented at: VII Congreso Internacional - 21a Reunión Técnica de la AATH, Salta, Argentina, 28-30 septiembre 2016. (2016):
- About this
data sheet - Structure-ID
20072210 - Published on:
28/11/2016 - Last updated on:
28/05/2021